Kings Cross Central P1

Kings Cross Central P1-Carillon
Kings Cross P1 is a mixed development forming part of the Kings Cross Central regeneration program. The building will comprise of the Frank Barnes School for deaf children, a Primary school, 77 key worker apartments and 183 open market apartments.

UBS were chosen to supply the 14 storey building with three of their standard 2000kg capacity, 3.2m long machines materials hoists. Serving the three individual blocks the hoists have played a major role in this development.

Due to finishing works of the school and some of the many apartments there were many restrictions in tying that UBS were able to overcome and provide a very efficient service.

  • UBS 2000kg capacity, 3.2m long materials hoists at Kings Cross 01

  • UBS 2000kg capacity, 3.2m long materials hoists at Kings Cross 02

  • UBS 2000kg capacity, 3.2m long materials hoists at Kings Cross 03

  • UBS 2000kg capacity, 3.2m long materials hoists at Kings Cross 04

  • UBS 2000kg capacity, 3.2m long materials hoists at Kings Cross 05

  • UBS 2000kg capacity, 3.2m long materials hoists at Kings Cross 06

Elektron Project
UBS Common Tower and Twin Standard Speed Passenger Hoists at Elektron Towers
London City Island
Broadgate Tower
Broadgate Tower twin passenger hoists common tower by UBS.
Beetham Tower
Beetham Tower UBS Common Tower Twin High Speed Passenger Hoist
St Botolphs Tower
St Botolphs Showing Both UBS Common Tower and Twin ans Single Standard Speed Construction Hoist Installations
Canary Wharf BP2
BP2 Canary Wharf UBS Common Tower System Twin High Speed Passenger Construction Hoist
Ontario Tower
Common Tower System and High Speed Construction Hoist from UBS, view of top, Ballymore Properties, Ontario Tower, London Close Distance View
Swiss Re Tower
Swiss Re The Gherkin Construction Mammoth & Twin High Speed Passenger Hoists on a UBS Common Tower
Highpoint Newington Butts
One The Elephant
One The Elephant Residential Development London
Stratford Residential Blocks
Athletes village blocks N03 N04 single hoists steel bridges 2 UBS construction hoists
St Bartholomew’s Hospital Phase 2
St Barts Project Phase 2 Construction Hoist Works Side View
Dandara KD Tower
Image Project Hemel Showing UBS Twin Mid Speed Construction Hoists And Common Tower System Distant View
Heron Tower
Heron Tower Distance shot UBS Common Tower & 2 Twin High Speed Passenger Construction Hoists
The Landmark
CPL The Landmark Tower Featuring UBS Twin Construction hoists for Passengers
Canary Wharf DS3
Canary Wharf DS3 East & West Project UBS Common Tower System Base
Dickens Yard
UBS Common Tower Access Syatem at Dickens Yard London
Kings Cross Central P1
UBS 2000kg capacity, 3.2m long materials hoists at Kings Cross 02
Seager Tower
Seager Tower UBS Common Tower & Twin Standard Speed Passenger Hoist
Chelsea Creek
Chelsea Creek Residential Construction Project Distant View
Lee Tunnel
Lee Tunnel Construction Using UBS Tri Mast Hoist Aerial View
Stratford Tower
150 Stratford High St Wide Tower 2 Cages UBS Hoists 2
Pan Peninsula Towers
Pan Peninsular Tower Featuring UBS Common Tower System and Twin Construction Hoists Site Wide View #2
Canary Wharf
Canary Wharf DS3 Citigroup DS5 HSBC UBS Construction Hoists
Dollar Bay
Dolar Bay Tower