Beckton Sewage Works Morgan Vinci Bachy Joint Venture (MVB JV) Location Beckton Sewage Treatment Works UBS have now completed all works on this prestigious project lasting five years
UBS have been involved in a number of projects involved in the supply of transport links, utilities and hospitals throughput the UK. These projects normally require substantial planning as they are often one off projects with their own specific requirements.
UBS has provided innovative access solutions to projects that have resulted in the supply of 6.2m long hoists to hospital projects to allow services to be fitted with half the joints and hoists installed in shafts 80m deep with only a single tie at ground level.
Below are a list of project links giving details of features of the access solutions provided by UBS.
Beckton Sewage Works Morgan Vinci Bachy Joint Venture (MVB JV) Location Beckton Sewage Treatment Works UBS have now completed all works on this prestigious project lasting five years
Kings Cross Central P1-Carillon Kings Cross P1 is a mixed development forming part of the Kings Cross Central regeneration program. The building will comprise of the Frank Barnes School for deaf children, a Primary school, 77 key worker apartments and 183 open market apartments. UBS were chosen to supply the 14 storey building with three
SKANSKA CONSTRUCTION – ROYAL LONDON HOSPITAL Part of the 10 year construction and refurbishment contract, Skanska are completing major construction works in moving the existing wards to new buildings and refurbishing existing buildings for new uses. UBS are supplying hoists and common tower to allow access in to the existing buildings, while maintaining a clear
SKANSKA CONSTRUCTION- BART’S HOSPITAL Part of the 10 year construction and refurbishment contract, Skanska are completing major construction works in moving the existing wards to new buildings and refurbishing existing buildings for new uses. The current phase requires the construction of a new block linking in to the previous phase recently completed. This has resulted
SKANSKA CONSTRUCTION- BART’S HOSPITAL PHASE 2 Part of the 10 year construction and refurbishment contract, Skanska are completing major construction works in moving the existing wards to new buildings and refurbishing existing buildings for new uses at St Bartholomew’s Hospital. The current phase is now concentrating on the fit out of the new and existing
STRATFORD 2012 GAMES RESIDENTIAL BLOCKS Supplier of construction hoists and access towers (Olympic Village) to the London 2012 Games As part of the construction works for the 2012 Games, UBS supplied hoists and Common Tower to nine of the residential blocks, and were the major supplier of hoists to this project with 68 standard speed