Wandsworth Riverside Quarter

GALLIFORD TRY – WANDSWORTH RIVERSIDE QUARTER
Galliford Try will undertake the design and construction of three mixed use buildings including 121 luxury apartments, associated affordable apartments and commercial space along with car parking as part of Phase 3A of Riverside Quarter, a prestigious residential project overlooking the River Thames.

UBS are supplying Passenger hoists and Common Tower for this project to allow the majority of the construction to be completed affecting the minimum number of apartments.

  • Wandsworth Common Tower System With Twin Hoists

  • Wandsworth Common Tower System With Twin Hoists

  • Wandsworth Common Tower System With Twin Hoists

  • Wandsworth Common Tower System With Twin Hoists

St Botolphs Tower
St Botolphs Showing Both UBS Common Tower and Twin ans Single Standard Speed Construction Hoist Installations
Canary Wharf BP2
BP2 Canary Wharf UBS Common Tower System Twin High Speed Passenger Construction Hoist
Broadgate Tower
Broadgate Tower twin passenger hoists common tower by UBS.
Heron Tower
Heron Tower Distance shot UBS Common Tower & 2 Twin High Speed Passenger Construction Hoists
Dollar Bay
Dolar Bay Tower
Ontario Tower
Common Tower System and High Speed Construction Hoist from UBS, view of top, Ballymore Properties, Ontario Tower, London Close Distance View
Canary Wharf
Canary Wharf DS3 Citigroup DS5 HSBC UBS Construction Hoists
London City Island
Seager Tower
Seager Tower UBS Common Tower & Twin Standard Speed Passenger Hoist
St Bartholomew’s Hospital Phase 2
St Barts Project Phase 2 Construction Hoist Works Side View
Stratford Residential Blocks
Athletes village blocks N03 N04 single hoists steel bridges 2 UBS construction hoists
Stratford Tower
150 Stratford High St Wide Tower 2 Cages UBS Hoists 2
Beetham Tower
Beetham Tower UBS Common Tower Twin High Speed Passenger Hoist
One The Elephant
One The Elephant Residential Development London
Chelsea Creek
Chelsea Creek Residential Construction Project Distant View
Dickens Yard
UBS Common Tower Access Syatem at Dickens Yard London
Lee Tunnel
Lee Tunnel Construction Using UBS Tri Mast Hoist Aerial View
Canary Wharf DS3
Canary Wharf DS3 East & West Project UBS Common Tower System Base
Swiss Re Tower
Swiss Re The Gherkin Construction Mammoth & Twin High Speed Passenger Hoists on a UBS Common Tower
Elektron Project
UBS Common Tower and Twin Standard Speed Passenger Hoists at Elektron Towers
Pan Peninsula Towers
Pan Peninsular Tower Featuring UBS Common Tower System and Twin Construction Hoists Site Wide View #2
The Landmark
CPL The Landmark Tower Featuring UBS Twin Construction hoists for Passengers
Kings Cross Central P1
UBS 2000kg capacity, 3.2m long materials hoists at Kings Cross 02
Dandara KD Tower
Image Project Hemel Showing UBS Twin Mid Speed Construction Hoists And Common Tower System Distant View
Highpoint Newington Butts