Finsbury Circus

SKANSKA CONSTRUCTION – FINSBURY CIRCUS
Initial works will include the demolition of the ground floor slab, together with structural alterations to the existing eight-storey office building. During the reconstruction phase, Skanska will add an additional floor at roof level to provide in excess of 1000 square metres of additional prime, fully serviced office space.

UBS have supplied hoists internally in to the basement, and also externally in Finsbury Square. As the building has a lightwell at the edge of the pavement, to allow the external hoists to be installed without the need for a grillage or gantry, the hoist mast was founded on the basement level in the lightwell, with the hoist running from ground level up to the upper levels.

  • UBS Single passenger hoist

  • Close up of UBS single passenger hoist

  • Wide view of single passenger hoist from UBS at Finsbury Circus

Dollar Bay
Dolar Bay Tower
London City Island
Beetham Tower
Beetham Tower UBS Common Tower Twin High Speed Passenger Hoist
Ontario Tower
Common Tower System and High Speed Construction Hoist from UBS, view of top, Ballymore Properties, Ontario Tower, London Close Distance View
Stratford Tower
150 Stratford High St Wide Tower 2 Cages UBS Hoists 2
Elektron Project
UBS Common Tower and Twin Standard Speed Passenger Hoists at Elektron Towers
Canary Wharf BP2
BP2 Canary Wharf UBS Common Tower System Twin High Speed Passenger Construction Hoist
Broadgate Tower
Broadgate Tower twin passenger hoists common tower by UBS.
Highpoint Newington Butts
Dickens Yard
UBS Common Tower Access Syatem at Dickens Yard London
Stratford Residential Blocks
Athletes village blocks N03 N04 single hoists steel bridges 2 UBS construction hoists
One The Elephant
One The Elephant Residential Development London
Lee Tunnel
Lee Tunnel Construction Using UBS Tri Mast Hoist Aerial View
Chelsea Creek
Chelsea Creek Residential Construction Project Distant View
Canary Wharf DS3
Canary Wharf DS3 East & West Project UBS Common Tower System Base
Canary Wharf
Canary Wharf DS3 Citigroup DS5 HSBC UBS Construction Hoists
Seager Tower
Seager Tower UBS Common Tower & Twin Standard Speed Passenger Hoist
St Bartholomew’s Hospital Phase 2
St Barts Project Phase 2 Construction Hoist Works Side View
Dandara KD Tower
Image Project Hemel Showing UBS Twin Mid Speed Construction Hoists And Common Tower System Distant View
St Botolphs Tower
St Botolphs Showing Both UBS Common Tower and Twin ans Single Standard Speed Construction Hoist Installations
The Landmark
CPL The Landmark Tower Featuring UBS Twin Construction hoists for Passengers
Pan Peninsula Towers
Pan Peninsular Tower Featuring UBS Common Tower System and Twin Construction Hoists Site Wide View #2
Kings Cross Central P1
UBS 2000kg capacity, 3.2m long materials hoists at Kings Cross 02
Heron Tower
Heron Tower Distance shot UBS Common Tower & 2 Twin High Speed Passenger Construction Hoists
Swiss Re Tower
Swiss Re The Gherkin Construction Mammoth & Twin High Speed Passenger Hoists on a UBS Common Tower